Promobv — Promob Plus SA Kitchen Workflow | promobv.site

Promobv — Promob Plus SA Kitchen Workflow | promobv.site

Placing Broom, Fridge, Wall and Base Units

The first stage of the Part 2 New Look Promob kitchen build runs from the broom unit and fridge at 01:00 to the ceiling-height adjustment at 24:02.

The Part 2 New Look Promob tutorial starts with unit placement. The first chapter marker is 'Adding a Broom Unit and Fridge' at 01:00, which tells you the opening move is two tall-format units rather than a base run.

Wall units follow at 10:50 under the chapter title 'Walls Units Install'. This places the upper run before any open shelving appears, which matters because shelf panels at 14:07 sit relative to the wall units above them.

Open shelf panels are added at 14:07. That is a separate step from wall unit installation, so the tutorial treats shelves as an addition to an existing wall run rather than part of its initial placement.

At 16:00 the tutorial adds 'more Base Units and tall Units'. The base and tall run is therefore expanded after the wall and shelf steps, not before them, which is the reverse of how many people instinctively start a kitchen.

Shelves between units are added at 22:12. This is a second shelving step, distinct from the open shelf panels at 14:07, and it comes after the base and tall units have been added.

The last unit-stage chapter is 'Changing the height of the wall units from the ceiling' at 24:02. It is deliberately late: by this point the wall units, base units, tall units and both shelf types exist, so a single height change can be assessed against the full run.

That ordering has a practical consequence. If you change wall unit height first, every subsequent unit placement and shelf position may need to be revisited. Doing it at 24:02, as the tutorial does, avoids that cascade.

The transition out of the unit stage is quick: the island chapter begins at 24:38, only 36 seconds after the ceiling-height adjustment. The wall run and the island are treated as adjacent concerns, not separate sessions.

A sensible working session is to stop after 24:02. The first 24 minutes produce a complete wall, base and tall run with shelves and a consistent ceiling gap, which is a clean checkpoint before the island stage.

The signature mark of this site, drawn as a plate

On narrow screens, swipe or scroll the plate sideways.

Common failure points in this stage are order errors rather than tool errors. Adjusting ceiling height before placing wall units, adding base units before wall units, or skipping the second shelving step at 22:12 all disturb the tutorial's sequence.

If you are following along rather than watching end to end, the minimum viable order is: broom unit and fridge, wall units, open shelf panels, more base and tall units, shelves between units, then ceiling-height adjustment. Each item has a timestamp you can scrub to.

Once the unit run is settled at 24:02, the next page covers the island, side and back panels, automatic worktops and kick plates. That stage starts at 24:38 and runs to the manual worktop editing at 35:28.

Begin by opening the Part 2 New Look Promob tutorial and scrubbing to 01:00, where the broom unit and fridge are added as the first tall-format elements. Before placing anything else, check that both units sit on the same floor plane and align at the front. Do not move on until this pair is stable, because every later wall and base placement is judged against this opening run.

At 10:50, install the wall units, then pause to confirm the top line and the gap above them. Only then add the open shelf panels at 14:07, treating them as a separate operation that hangs off the existing wall run. A practical check is to look along the wall from one end: the shelf panels should read as additions to that run, not as replacements for it.

At 16:00 the tutorial adds more base and tall units, after the wall and shelf steps. Place these against the existing run and check the front line and floor contact before continuing. At 22:12 add the shelves between units, which is a distinct step from the earlier open shelf panels, so do not assume the first shelving pass covered it.

The ceiling-height change comes at 24:02, deliberately late. With wall, base and tall units plus both shelf types in place, adjust the wall unit height and assess the gap against the full run in one pass. If you change height earlier, expect to revisit shelf and unit positions; the tutorial avoids that by leaving it until the run is complete.

The island begins at 24:38. Build the island unit, then at 30:08 add the side panels and back panel; check that the panels close the island cleanly on the visible faces. At 33:04 apply the automatic worktops and kick plates, and at 34:12 remove unwanted top parts. Manual worktop editing follows at 35:28, so treat the automatic result as a starting point, not a final one.

Colours come at 39:36 for units, worktop and kick plate, and at 51:40 the wood shelf is changed to a glass finish. Save at 53:14. There is no stated time for walk-through output beyond the separate Walk-Through tutorial, and printing is covered separately in the Floor plan tutorial, so treat both as follow-on viewing rather than steps inside this build.

  • 01:00 — Adding a Broom Unit and Fridge
  • 10:50 — Walls Units Install
  • 14:07 — Adding Open Shelf panels
  • 16:00 — Adding more Base Units and tall Units
  • 22:12 — Adding more Shelves between Units
  • 24:02 — Changing the height of the wall units from the ceiling

Questions and answers

Why is the ceiling-height adjustment placed so late in the unit stage?
The chapter list puts it at 24:02, after base units at 16:00 and shelves between units at 22:12. At that point the full run exists, so one height change can be judged against every unit and shelf instead of being reworked later. The island then starts 36 seconds afterwards at 24:38.
Is there one shelving step or two?
The known facts list two: 'Adding Open Shelf panels' at 14:07 and 'Adding more Shelves between Units' at 22:12. They are separated by the addition of more base and tall units at 16:00, so treat them as distinct operations at different points in the run.
Can I start with base units instead of wall units?
The tutorial order does not support that. Wall units come at 10:50, base and tall units at 16:00. Starting with base units means the shelf panels at 14:07 and the wall run they relate to are missing when you place them, so you would be working against the demonstrated sequence.

Further reading